Plumbing Control Application Form Fees
2023 CONTROL FORM FEES
Installation Control Application Form
(1ɸ-3ɸ) Transient Current | 150 TL |
1ɸ 63A | 200 TL |
3ɸ 63A | 700 TL |
3ɸ 80A | 950 TL |
3ɸ 100A (Included) - up to 159A
| 1.400 TL |
3ɸ 160A (Included) - up to 249A | 2,000 TL |
3ɸ 250A (Included) - up to 399A | 2.500 TL |
3ɸ 400A (Included) - up to 629A | 6,000 TL |
3ɸ 630A (Included) - up to 999A | 12,000 TL |
3ɸ 1000A and ABOVE | 25,000 TL |
Solar Energy Systems Installation Control Application Form
Amount of Installed Power | Fee |
Up to 5 kWp (Including 5kWp) | 350 TL |
Between 5-10 kWp (Including 10kWp) | 500 TL |
Between 10 kWp and 50 kWp (Including 50 kWp) | To 10 kWp additional=500 TL (+) 30 TL for each kWp |
51 kWp and ABOVE | To 50 kWp additional=1.700 TL (+) 40 TL for each kWp |
* Fees valid as of 01/11/2023.